Quote:
Originally Posted by jnorman34
The last CD project I did on reaper exceeded 20gb due to the number of songs, many sessions and many many retakes, etc. I was wondering if this is deleterious in any way to reaper's operation or if is somehow harder on my computer (like stuffing too much data in ram) than if I use multiple smaller projects to build a CD. Thoughts?
|
Well, the bigger the project gets, the longer the loading times become. Everything
becomes more sluggish and slower with large projects. That's why it often makes
sense to divide a large project into smaller parts using subprojects.