Prev Previous Post   Next Post Next
Old 01-24-2020, 03:00 PM   #1
lexaproductions
Human being with feelings
 
Join Date: Jan 2013
Posts: 1,128
Default Item Timebase: Project vs Track

When setting an item Timebase we either have:

1- Track/Project Timebase
2- Time
3- Beat Project Length
4- Beat
5- Beat Auto Stretch

What do we do if we want to set an item to a Track Default that's different from the Project Default???
lexaproductions is offline   Reply With Quote
 

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -7. The time now is 02:56 PM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2024, vBulletin Solutions Inc.